Photovoltaic tender

Planning PV projects correctly and selecting components

New requirements for public and commercial PV projects

Anyone preparing a photovoltaic tender or participating in one as a bidder must now take more factors into account than just output, cost-effectiveness and price. Technical requirements, sustainability, origin, supply chains and resilience are playing an increasingly important role in the procurement of photovoltaic systems.

With the Net-Zero Industry Act (NZIA), the question of where key components of a PV system are manufactured and how resilient their supply chains are is becoming particularly important. This applies to solar modules as well as PV inverters.

It is therefore worthwhile for public contracting authorities, planners, project developers, EPCs and installers to take the requirements of a PV tender into account right from the system planning stage.

Are you planning a PV project with specific requirements regarding origin and resilience? Please
get in touch with us to discuss your project’s requirements.

Head of Sales DACH
Hans-Bernd Wiesener
Mobile: +49 172 8556959
Email: h.wiesener@kostal.com

Head of Sales for Europe
Lars Brinkmeyer
Mobile: +49 163 9160186
Email: l.brinkmeyer@kostal.com

A high-performance product range

European value creation has been the norm at KOSTAL for decades.

High-performance: KOSTAL PLENTICORE inverter

Solar: The
ENECTOR wallbox

Clever: Optimising with the
KOSTAL Energy Meter

Reliable: Emergency power with
the KOSTAL BackUp Switch

Manufactured in Hagen. Quality from Germany.

In Hagen, KOSTAL combines development, electronics manufacturing and production into an integrated manufacturing process – ensuring reliable inverters and long-lasting system solutions.

Modern manufacturing technologies at the Hagen site

Every stage of production adheres to clearly defined quality standards

Precision manufacturing for the highest product quality

Development and production – perfectly coordinated

What should you bear in mind when taking part in a photovoltaic tender?

A PV tender sets out the technical, economic and, where applicable, regulatory requirements for a photovoltaic project. Depending on the project, the following points, for example, may be relevant:

  • System capacity and technical design
  • Requirements for solar modules and inverters
  • Battery storage and energy management
  • Grid connection and feed-in management
  • Technical standards and certificates
  • Warranty and service
  • Sustainability requirements
  • Origin of components
  • Supply chain resilience
  • Required manufacturer and supplier documentation

Which criteria are binding is determined by the relevant procurement and tendering procedure.

Photovoltaic tenders and the NZIA

Through the Net-Zero Industry Act, the European Union aims to strengthen production capacities for climate-neutral technologies in Europe and reduce strategic dependencies on individual third countries. Photovoltaics is one of the net-zero technologies covered by the NZIA.

As a result, in relevant public procurement procedures, criteria other than price may take on greater significance. 

The focus is on, amongst other things:

  • Resilience: supply chains should be less dependent on individual third countries.
  • Sustainability: Environmental requirements can be given greater consideration in procurement.
  • Origin: The place of production of strategically relevant technologies and components may be relevant to the evaluation of a tender.
  • Traceability: Depending on the tender, specific information and documents regarding origin and the supply chain may be required.

 

For bidders, this means that the choice of components can have a direct impact on a PV project’s eligibility for tender.

Non-price criteria: When price isn’t the only deciding factor

In a traditional tender process, price is often of particular importance. European industrial policy broadens this perspective. So-called ‘non-price criteria’ allow other aspects of a tender to be taken into account. Depending on the specific procedure, these may include, for example:

  • Resilience
  • Sustainability
  • Responsible procurement
  • Origin
  • Supply chain security

This opens up a new perspective on the procurement of photovoltaic systems. It is not just the lowest purchase price of a component that matters, but also its contribution to a resilient and sustainable PV system.

Which components might be relevant in a PV tender?

The requirements for resilience are not necessarily limited to solar modules. The NZIA examines various key components of the photovoltaic value chain. These include, amongst others:

  • PV polysilicon
  • Ingots and wafers
  • PV cells
  • Solar glass
  • PV modules
  • PV inverters
  • PV trackers and specific mounting structures

This means that, when preparing a photovoltaic tender, clients and bidders should not only consider the origin of the modules. The choice of inverter can also be relevant to the resilience of the overall project.

Are you planning a tender for a photovoltaic system?

Technical considerations, cost-effectiveness and regulatory requirements should be considered together from the outset in larger PV projects. KOSTAL offers inverters manufactured in Germany and across Europe for residential, commercial and large-scale photovoltaic applications.

If the origin, resilience or European value creation of your project are key considerations, please speak to us at an early stage about the requirements of your tender.

KOSTAL will help you select the right inverter solution for your PV project.

Head of Sales for
Germany, Austria and Switzerland Hans-Bernd Wiesener
Mobile: +49 172 8556959
Email: h.wiesener@kostal.com

Head of Sales for Europe
Lars Brinkmeyer
Mobile: +49 163 9160186
Email: l.brinkmeyer@kostal.com

You might also be interested in this

Inverters Made in Germany

Where an inverter is developed and manufactured is becoming increasingly important. Find out why KOSTAL, with its inverters ‘Made in Germany’, stands for quality, technological expertise and European value creation.

→ find out more

European inverters
for resilient PV systems

European manufacturing can help to strengthen supply chains and reduce strategic dependencies. Find out more about KOSTAL inverters ‘Made in Europe’ and their importance for a resilient photovoltaic sector.

→ Find out more

What does the NZIA mean for photovoltaics?

The Net-Zero Industry Act is designed to strengthen Europe’s production of net-zero technologies. Find out what role resilience, origin, non-price criteria and European PV components play in this.

→ Find out more

What role do inverters play in the NZIA?

The NZIA does not only apply to modules and solar cells. PV inverters are also key components of the PV value chain. Find out what this means for planning, procurement and tenders.

→ find out more

PV tenders: Taking new criteria into account at an
early stage

Technology and price are not always the only criteria. Find out how resilience, origin, sustainability and the NZIA can become increasingly important in photovoltaic tenders.

→ find out more

Is there NZIA funding available for photovoltaic systems?

The NZIA is not a traditional PV funding scheme – but it can influence the requirements for tenders and funding mechanisms. We explain what lies behind ‘NZIA funding for photovoltaics’ and what project developers should bear in mind.

→ Find out more